How we deploy
Every project starts with a site survey and operational requirements
SVTEK only publishes project images once usage rights are in place and any information that could identify the customer has been removed.
Deployment framework
The process aligns objectives, equipment, infrastructure and handover criteria before installation begins.
- Survey
Record the floor plan, viewing points, network conditions and power supply.
- Design
Choose the architecture, retention period, permissions and scalability.
- Deployment
Install, configure and test each item according to the plan.
- Handover
User training, configuration records and an agreed support channel.
Looking for a similar solution?
Send us the type of site, its scale and the problem to solve. An SVTEK engineer will discuss it in the context of your situation.
